The Party Wall Award.
The document that governs everything.
An Award is the binding determination made by the surveyors once a dispute, real or deemed, has arisen. It sets out what may be done, how, when, and what happens if something goes wrong. For an adjoining owner it is the entire substance of the protection the Act offers, which is why what it says matters more than that it exists.
What an Award actually says.
If it does go to surveyors, the Award is the document that settles it. It sounds daunting, so here it is in plain English. Hover, focus or tap any clause to see what it does for you.
The Works
Exactly what's authorised: the notifiable works and the way they're to be carried out. Anything outside this isn't covered.
Specimen wording only. Every Award is written for the specific matter.
Illustrative wording. Your Award is drafted for your property and circumstances.
What a properly drafted Award contains.
There is no statutory template, and the quality gap between a thorough Award and a boilerplate one is wide.
A generic Award with the address changed will contain most of the headings below and very little underneath them. The value is in the specifics: the actual sequence, the actual hours, the actual monitoring thresholds for this excavation next to this building.
The standard clauses
- The parties and the properties, and the surveyors' appointments, including the third surveyor selected under section 10(1)(b).
- The authorised works, described specifically and by reference to identified drawings. Anything not described is not authorised.
- The schedule of condition, annexed, recording the adjoining property before works begin.
- Working hours and days, and restrictions on noisy or vibratory operations.
- Access under section 8. When, on what notice, and for what.
- Protection and temporary works, including weatherproofing where a wall is exposed.
- The duty to make good any damage, or to pay in lieu at the adjoining owner's election under section 11(8).
- Surveyors' fees and who pays them.
- Rights reserved to inspect during the works and to make further or addendum Awards if matters arise.
What a thin Award leaves out.
These are the omissions that turn into arguments on site. Every one of them from a real matter.
No sequencing for underpinning
A schedule of condition in name only
Silence on drainage
Vague scope
No provision for changes
You have 14 days from service to appeal
Award questions
Is the Award legally binding?
Yes. An Award made under section 10 binds both owners and their successors in title, and it remains binding unless successfully appealed to the county court within 14 days of service. It can be enforced like a judgment, and works carried out in breach of it lose the statutory authority the Act would otherwise give.
Can I appeal an Award I disagree with?
Either owner may appeal to the county court within 14 days of the Award being served on them. The 14 days is strict. Appeals are uncommon and the court will not simply substitute its own view. You need to show the surveyors went wrong in law or acted outside their jurisdiction. Take advice immediately rather than at the end of the month.
What if new works come up that the Award doesn't cover?
The Award authorises the works it describes and nothing else. If the scheme changes materially, the surveyors can make an addendum Award, or a fresh notice may be needed depending on how far the change goes. Carrying out works outside the Award is carrying them out without authority.
Does the Award decide who owns the wall or where the boundary is?
No, and this is a common misconception. Party wall surveyors have jurisdiction only over matters arising under the Act. Ownership, the precise position of the legal boundary, rights to light and restrictive covenants all sit outside it and are questions for a solicitor or a boundary specialist.
How long does an Award take to produce?
Typically two to four weeks from the appointment of surveyors for a straightforward matter, provided drawings and structural details arrive promptly from the building owner's side. Basement and deep excavation matters take longer because there is materially more to review. Ground investigation, temporary works design and monitoring proposals all have to be examined before anyone signs.
Had an Award served on you?
Send it over. We will tell you whether it covers what it should, whether anything material is missing, and whether the 14-day appeal period is something you need to think about.
- The building owner normally pays your surveyor's reasonable fees
- A named surveyor on your case from start to finish
- We will tell you honestly if you do not need us
No card details. No obligation. Nothing is final until you sign the appointment. A member of our office team reads every message, and a surveyor replies, usually within one working day.
Related reading
- The schedule of condition
The annexe that decides damage claims.
- Appointing your own surveyor
Who agrees the Award on your behalf.
- The Act explained
Where the Award machinery comes from.