For adjoining owners

Consent or dissent?
What each one actually costs you.

Consenting takes thirty seconds and ends the process. Dissenting takes a phone call and brings in a surveyor, a schedule of condition and a binding Award, normally at your neighbour's expense. Neither is automatically right, but only one of them is reversible, and it is not the one people usually pick.

Side by side

The honest comparison.

Consent is not a trap, and plenty of adjoining owners are right to give it. But the two routes are not close substitutes, and the covering letter with your notice will not have spelled this out.

 If you consentIf you dissent
Schedule of conditionNone, unless you arrange and pay for one yourself.Prepared as standard and annexed to the Award, at the building owner's cost.
Party Wall AwardNone. There is no document governing the works.A binding Award setting out scope, method, hours, access and protection.
Working hours and accessWhatever your neighbour and their builder decide.Fixed by the Award, including whether anyone may come onto your land.
If damage occursAn ordinary civil claim, funded and proved by you, with no dated record of the 'before'.The building owner must make good. The surveyors determine it under the Award.
Design scrutinyNobody reviews the structural design on your behalf.Your surveyor reads the drawings and calculations with your property in mind.
If something goes wrong on siteYou are negotiating directly with your neighbour and their builder.You telephone your surveyor, who deals with it professionally.
Cost to youNil.Normally nil. The building owner pays the reasonable fees of both surveyors.
Can you reverse itNo. Consent is final for that notice.Not applicable, dissenting keeps every option open.

The asymmetry worth noticing

Both routes cost you nothing. One of them ends with a dated record of your property, a binding document and a professional accountable for the detail. The other ends with a builder starting work. If the cost is the same either way, the question is only what you want in return.
Being straight about it

When consenting is the right call.

We would rather tell you that you do not need us than take an instruction you did not need to give.

Small, shallow, and away from your foundations

Cutting in a small beam, a modest single-storey extension with shallow foundations well away from your building, replastering a shared wall, or refixing to it. Low structural risk, short duration, nothing to excavate.

You know the neighbour and the builder

A long-standing relationship, a contractor you have seen work well, and a scheme you have already discussed openly. The Act is not the only way to manage risk, and goodwill has real value.

Anything involving excavation

Basements, underpinning, piling, deep foundations, lift pits, drainage runs. Ground movement is the mechanism behind most serious party wall damage, and it is invisible until it is not.

Your property is old, listed or unusual

Cob, rubble stone, timber frame behind later render, Bath stone ashlar, historic lath and plaster, or previous movement and repairs. These behave differently and deserve a surveyor who looks before agreeing.

Removing a chimney breast or a large opening

Both remove load-bearing material from a wall you share. Chimney breast removal in particular can leave the remaining stack on your side inadequately supported, and it is very commonly done badly.

The scheme is vague or still changing

If nobody can tell you exactly what is being built, consenting means consenting to something undefined. An Award pins the scope down, which protects both owners.
A word on pressure

"Just sign it, it'll save everyone money."

You may hear a version of this from your neighbour, their builder, or the surveyor they have already engaged.

It is worth understanding why. Consent removes the second surveyor, the Award and the schedule of condition, which lowers the building owner's costs and shortens their programme. That is a real saving, for them. It saves you nothing, because you were never going to be paying.

None of which means your neighbour is acting in bad faith. Most are not; they are being told by their own side that consent is the smooth option, and it is. But the person urging you to consent has an interest in the answer, and you are entitled to take ten minutes and a second opinion before deciding. That opinion costs you nothing here.

Consent and dissent, answered

Is dissenting rude?

No, and the word does more damage than the act. 'Dissent' in the Act does not mean objecting to your neighbour's plans. It means electing to have the works governed by an Award rather than proceeding informally. Most building owners' surveyors expect it, and many building owners prefer it, because an Award protects them too: it fixes the scope, records the starting condition and limits arguments later.

If I consent, can I change my mind later?

No. Consent is final for that notice. If your neighbour later changes the works materially, that may require a fresh notice which you can respond to differently. But you cannot withdraw a consent you have given because the work turned out noisier or messier than you expected.

Does consenting mean I lose the right to claim for damage?

Not entirely, but it changes the route and makes it much harder. Without an Award you have no schedule of condition and no surveyor mechanism, so a claim becomes an ordinary civil dispute in nuisance or negligence. Which you fund yourself and have to prove yourself, without a dated record of what your property looked like beforehand. Under an Award, the building owner's duty to make good is built in and the surveyors resolve it.

Can I consent but still ask for a schedule of condition?

You can ask, and some building owners will agree voluntarily. But you are asking for a favour rather than exercising a right, you have no say over who prepares it or how thorough it is, and there is no Award making it binding. If a schedule of condition is what you want, dissenting is the reliable way to get one.

My neighbour says dissenting will cost them thousands and delay everything.

It will cost them more than consent. That is true and it is why the pressure gets applied. But the Act deliberately puts that cost on the person carrying out the works, and the delay is largely within their control: an Award is usually agreed in two to four weeks, and it moves faster when their side provides drawings and structural details promptly. Being told that protecting your home is unreasonable is a sales position, not a legal one.

Not sure which way to go?

Read us the notice and describe the works. We will tell you which route we would take if it were our house, and why, with no obligation and nothing to pay.

  • The building owner normally pays your surveyor's reasonable fees
  • A named surveyor on your case from start to finish
  • We will tell you honestly if you do not need us
Appoint us as your surveyorTalk to us first, freeor call 01174420259

No card details. No obligation. Nothing is final until you sign the appointment. A member of our office team reads every message, and a surveyor replies, usually within one working day.

Related reading